The fit out included a telecoms lab, a Certified PC2 Microbiological laboratory and a Micro-Nano Fabrication Room which included working areas for a probe station, optical table and fume cupboard that required isolated works associated to the installation of the specialised equipment. Our solution embedded a variety of design features & provisions in the spatial planning to enable the department to be flexible to change & future ready.
Venko helped facilitate the relocation of the College of Engineering and Science department to a new ‘future-proofed’ environment at the Footscray campus. Consulting with the Victoria University Research Infrastructure & Biosafety Team stakeholders, our briefing process ensured our design for teaching space aligned with the ongoing ‘Campus Masterplan’.
Venko helped facilitate the relocation of the College of Engineering and Science department to a new ‘future-proofed’ environment at the Footscray campus. Consulting with the Victoria University Research Infrastructure & Biosafety Team stakeholders, our briefing process ensured our design for teaching space aligned with the ongoing ‘Campus Masterplan’.
The fit out included a telecoms lab, a Certified PC2 Microbiological laboratory and a Micro-Nano Fabrication Room which included working areas for a probe station, optical table and fume cupboard that required isolated works associated to the installation of the specialised equipment. Our solution embedded a variety of design features & provisions in the spatial planning to enable the department to be flexible to change & future ready.
Venko gather on Wurundjeri Country. We acknowledge the traditional owners of this land and pay our respects to their Elders, past, present and emerging. We extend that respect to all Aboriginal and Torres Strait Islander peoples today.